Twin Hills
Twin Hills

Twin Hills

An established asset with a strong foundation for redevelopment. Located in the broader Texas district, Twin Hills combines a historical open pit, established site infrastructure, on-site accommodation, and recent technical activity — providing a practical base for future redevelopment.

Location Texas District, Queensland
Portfolio Silver Star Resources — Cornerstone Asset
Asset Type Historical Open Pit & Site Infrastructure
Status Dewatering & Drilling Underway
Project Overview

A Strategic Resource Opportunity

Twin Hills is one of the cornerstone assets within the Silver Star Resources portfolio. The site includes key physical assets such as smelting and solution pond infrastructure, core handling facilities, workshops, offices, and accommodation, all of which support ongoing site activity and future development planning. Recent dewatering and drilling programs have advanced understanding of the asset, while strengthening its position within Silver Star Resources’ broader project pipeline. With infrastructure already in place and technical work continuing to refine the scale of the opportunity, Twin Hills represents a strategically positioned project with a strong operational foundation and clear scope for further growth.

LocationTexas District, Queensland
Asset TypeHistorical open pit with existing site infrastructure
Pit DepthApproximately 38 metres
Water RemovedApproximately 30 megalitres to date
Historical DrillingTo depths of approximately 420 metres
Site AccommodationCapacity for approximately 15 workers
StatusDewatering, drilling & technical review underway
Twin Hills open pit at the project site in the Texas district, Queensland
The Project

An Established Base for Redevelopment

The Twin Hills pit is a central part of the project and remains a significant on-site asset. Silver Star Resources has already reduced the pit water inventory by approximately 30 megalitres, improving site accessibility and supporting future operational planning.

Twin Hills is more than a legacy mining asset — a strategically positioned project with a strong operational foundation and clear scope for further growth.

With a depth of approximately 38 metres, this progress highlights practical on-ground advancement and the work already undertaken to prepare the Twin Hills pit for the next stage of development.

Location

Strategically Located

Twin Hills is located in the broader Texas district in Queensland, at 8872 Stanthorpe Texas Road, Texas, Queensland 4385. The project sits within a connected project area — less than one kilometre from Mt. Gunyan and just over one kilometre from the Silver Spur slag deposit — positioning it centrally within Silver Star Resources’ broader Texas Silver corridor.

Drilling location within the Twin Hills project area, Texas district, Queensland

Twin Hills — Texas District, Queensland

Project Characteristics

Key Project Characteristics

01

Location

Positioned within the Texas district, Queensland, forming part of a connected project area alongside Mt. Gunyan and Silver Spur.

02

Infrastructure

Existing smelting and solution pond facilities, core handling, workshops, offices and accommodation already in place on site.

03

Resource Advancement

Recent dewatering, drilling and reanalysis of historical core continue to refine understanding of the deposit.

04

Development Potential

2025 drilling confirmed mineralisation at depth, supporting the case for further step-out and infill drilling.

Project Insight

Drilling & Resource Growth

Historical drilling to ~420m 2025 drilling: mineralisation confirmed at depth Retained core library

Twin Hills continues to demonstrate both exploration and redevelopment potential through a combination of historical drilling results and more recent technical work. Historical drilling at the site extended to depths of approximately 420 metres, while recent desktop review and reanalysis of historical core for silver and gold have further refined understanding of the deposit and its broader mineralised system.

More recently, drilling undertaken in 2025 confirmed mineralisation at depth, strengthening the case for continued exploration and highlighting the potential for further growth through step-out and infill drilling.

Twin Hills also benefits from a retained core library and associated technical materials, providing a valuable resource for ongoing geological review, reinterpretation, and future program design. Access to historical core supports more efficient technical work by allowing Silver Star Resources to reassess previous drilling, validate historical interpretations, and refine future targeting without relying solely on new field activity.

Existing site infrastructure at the Twin Hills project Twin Hills Project
Project Status

Established Base, Active Progress

01

Current Position

Historical open pit and site infrastructure retained on site, including smelting and solution pond facilities, workshops, offices and accommodation. Approximately 30 megalitres of water has been removed from the pit, improving site accessibility.

02

Recent Progress

2025 drilling confirmed mineralisation at depth. A retained core library and recent desktop review continue to support reinterpretation of historical results and refinement of future targeting.

03

Next Stage

Continued step-out and infill drilling to build on confirmed mineralisation and further refine the scale of the opportunity as technical work advances.

Silver Star Resources Portfolio

Explore Our Projects

Twin Hills forms part of a wider, connected project area within the Texas district. Discover the other assets within the Silver Star Resources portfolio.

Silver Star Resources

Discover the Twin Hills Project

An established asset with infrastructure in place, active technical progress, and clear scope for future redevelopment within the Texas district.